01 · SCOPE OF SUPPORT
What does this procedure involve?
A company’s experience with similar work does not mean that it satisfies the qualification criteria for every tender. The administrative specifications, technical specifications, draft contract and annexes should be read together. Documents must not only contain the right information but also be submitted in the required form and match current records.
In electronic procurement, preparing the application, signing it through an authorised person and submitting it on time are different steps. A draft saved in the system does not establish that a bid has been submitted. Responsibilities should be allocated clearly before the final submission.
Tender document review
Assess participation conditions, contractual obligations, guarantees and document requirements from a legal perspective.
Authority and participation file
Review consistency between company representation documents, powers of attorney and the tender participation information.
Clarifications and correspondence
Follow additional document requests, clarifications and outcome notices within the agreed service scope.
Assessment of remedies
If a complaint or dispute arises, identify the deadlines, competent authority and legal options.
02 · THE PROCEDURE
From preparation to follow-up, step by step
Identify the tender and timetable
Establish the tender reference, document version, final submission date and time, and the responsible team.
Match the qualification conditions
Identify supporting evidence and the person responsible for providing it for each qualification requirement.
Check representation and electronic authority
Assess the submitting person’s company representation or power of attorney together with their EKAP authorisation.
Complete and submit the file
Prepare the mandatory information and documents in the current system, retaining signature and submission records.
Follow subsequent stages
Monitor additional documents, explanations of abnormally low bids, the outcome and the invitation to sign the contract against their respective deadlines.
03 · DOCUMENT PREPARATION
Documents and preparation checklist
0 / 7 document categories prepared
Use this as a preparation checklist. The authority or your circumstances may require additional documents. Selections are cleared when you leave the page.

The current EKAP framework and tender participation document
The electronic procurement framework that entered into force on 1 August 2025 introduced the tender participation document, known in Turkish as the ihaleye katılım belgesi, into bid preparation. The current documents for the tender and EKAP guidance should be used instead of old examples of the qualification information table.
Information entered in the system and its supporting documents must be accurate and up to date. Electronic verification does not remove the company’s responsibility to check its own records. The information to be uploaded or declared is identified according to the procedure concerned.
Representation powers and joint ventures
The company’s representation arrangements in the trade registry and the authority of the person acting electronically are reviewed together. Where participation is through an attorney-in-fact, the scope of the power of attorney matters. Access to a user account does not, by itself, confer legal authority to represent the company.
For joint ventures, each participant’s document, qualification and signing responsibilities are assessed under the relevant rules. The document set prepared by one participant should not be assumed to satisfy the obligations of the others automatically.
Pre-contract risks and available remedies
The ability to perform the contract deserves consideration alongside the prospect of winning the tender. Delivery, acceptance, penalties, price adjustments, subcontracting and payment provisions may affect the decision to bid. Technical or financial assumptions are checked using information from the relevant specialists.
Where an unlawful act is alleged, the competent authority and deadline depend on the type of decision or procedure and when it was learned of or notified. Presenting one deadline for every tender could be misleading. The existing file, notifications and information about obtaining the tender documents require a separate assessment.
POINTS TO WATCH
Common mistakes and important distinctions
Working from an old template
Documents used in an earlier tender may no longer be sufficient after changes to the electronic system or legislation.
Leaving preparation until the last moment
Missing authorisations, electronic signatures and documents should not first be discovered at the final submission stage.
Assuming technical compliance
Legal review does not automatically verify that a product or service meets the technical specifications.
Failing to monitor notifications
Clarification and document requests after submission may also have deadlines. Notifications must continue to be followed.
PLANNING THE WORK
Legal fees, expenses and timing
How are fees and expenses determined?
Fees depend on the subject of the tender, document volume, joint venture structure, foreign documents and stages to be followed. Document review, file preparation, clarification support and administrative applications may be separate tasks. Bid or performance guarantees, institutional application charges, notary, translation and technical report costs are separate from legal fees. Complaint handling or litigation is not automatically included in the initial scope. Responsibilities, deliverables and deadlines should be recorded in writing before work starts. Fees are not based on a promise to win the tender or secure acceptance of an administrative application. Official charges are verified against the current tariff.
What can affect the timetable?
The final bid submission date and time establish the central timetable, but document preparation, authorisation and specialist work must be completed beforehand. Requests for additional information, clarification procedures and invitations to sign the contract may create separate deadlines. Time limits for remedies vary according to the decision concerned and the form of notification. Knowing the tender date alone is therefore not enough. The first consultation uses the tender reference and existing notifications to prepare a prioritised timetable.
HYPOTHETICAL EXAMPLE
Example scenario: Participating in an electronic tender for the first time
Suppose a company intends to bid electronically for the first time to supply equipment to a public institution. The technical team considers the products suitable, while management is focused on pricing. Legal review separately examines the qualification documents required by the specifications, the company’s current representation arrangements and the contractual delivery terms. Information in the tender participation document is matched to the underlying records. Relevant specialists complete the technical conformity documents, while responsible departments supply financial and guarantee information. The person responsible for signing the bid and retaining its submission record is clearly identified. The outcome notification and any subsequent requests are monitored in the same file. This hypothetical example does not mean that a company will necessarily be found qualified or win the tender; it illustrates the allocation of preparation tasks.
QUESTIONS AND ANSWERS
Frequently asked questions
Does the lawyer determine the bid price?
Pricing and technical cost calculations are the responsibility of the business and its specialists. The lawyer assesses legal conditions and contractual risks.
Can I use the old qualification information table?
The current electronic framework uses the tender participation document. Follow the relevant tender documents and EKAP guidance.
Does access to an EKAP account provide sufficient authority to represent the company?
System permissions and legal authority to represent the company must be examined together.
Can I obtain only a review of the specifications?
Yes. A limited legal review of the documents and contract terms can be provided before the decision to participate.
Is the complaint deadline the same for every tender?
The type of procedure, applicable rules and date of awareness or notification matter. A single deadline should not be given without reviewing the file.
READ THE ORIGINAL SOURCES
Official sources and application information
- Public Procurement Authority — Electronic Procurement Regulation ↗
Tender participation documents, authorisation and electronic procedures.
- EKAP Help Portal ↗
Current guides to registration, bidding, signatures, clarifications and contracts.
This English edition was prepared on 10 November 2026 from the Turkish guide dated 9 November 2026, retaining its official sources. Editorial dates are not legislation commencement dates or a record of individual lawyer approval. Some sources are in Turkish. Current authority requirements and the circumstances of your matter must be considered together. Editorial policy (Turkish)